Well, up again early today. JCB driver here before 8am which got us all moving.
The hole in the garden grew huge within hours and I contactede the building inspector to check that we had dug down to the required depth. 
Building inspector arrived early enough for us to manage to get hardcore to then fill the hole back up.
We hired a roller to compact the hardcore and fletten the surface.
It took 4 x 18 tonne lorry loads to fill the base to the required height before the stone arrives.
We also got the Inspector to check the treatment plant percolation holes and test results which are well within limits.
The site has to be secured every night which takes a while to do