Max is first to walk on the new slab of freshly set concrete. Here the shuttering is being removed and put onto the trailer beyond the slab. The pipes protruding from the slab are the drainage pipes and inlet pipe for the water and waste.
Max demonstrating where the front door will be, no necessity for that at the moment.
The visqueen that lay under the slab and was wrapped over the lower level of the slab. Now the 2nd shuttering section has been removered, the visqueen is now folded over to where the face brick layer will be laid.
Here's Piers checking out the messy bits around the raft.
View looking from the far side of the slab towards the garage.
Next picture is taken looking towards the front of the plot.