15 - 22 July below dpc bricks going down and leveling of the earth around.

Corner closest to the Garage wall side.

Brickwork to the Damp course level here.

One of many photo's of pillar's to get an idea of how we want ours to look.

 Back wall of the house, looking towards the garage.
This is how I'd like the porch and pillar to look.(The reverse way around)

Front of house with bricks ready for formations and layouts of internal solid walls.
Nature reserve next door all back to normal, we even managed to save the Teesle, see
next photograph.
The teesle's

M&B arrive to flatten and level the plot around the foundations.

Another wet day for them.

All leveled and ready for building the block.

Another shot of the front.

Down the back of the house where all the drainage lies.