Ground all leveled and the blocks have arrived and started to be built.
The house is beginning to take shape. 3/08/11
Sand has been dalivered and covered
The back wall of the house.
The South West wall, 2.4 m space for the tri-fold door and to the right, the lounge window.
The back door and the hockey sticks for the electricity supply.
The lounge from inside.
Sand has been dalivered and covered
The back wall of the house.
The kitchen from the lounge
The South West wall, 2.4 m space for the tri-fold door and to the right, the lounge window.
The back door and the hockey sticks for the electricity supply.
The lounge from inside.
A view from the side of the garage. 9th August 2011.
No comments:
Post a Comment