Thursday, 1 September 2011

After our hols in France for a week the plot is looking a little different.......1st August.

Ground all leveled and the blocks have arrived and started to be built.

The house is beginning to take shape. 3/08/11
Sand has been dalivered and covered
 The back wall of the house.
The kitchen from the lounge

 The South West wall, 2.4 m space for the tri-fold door and to the right, the lounge window.
 The back door and the hockey sticks for the electricity supply.
 The lounge from inside.
A view from the side of the garage. 9th August 2011.